Arapahoe Basin
Clear
via Loveland Pass
- Air
- 33°F
- Road
- 36°F
- Gusts
- 8 mph
- Surface
- Dry
Sensor 0.3 mile West of Herman Gulch Road, 6 min ago
- Eisenhower Tunnel & Keystone Clear
Wheat Ridge to A-Basin, Copper and Winter Park
Updated 6:15 PM
Construction on the Floyd Hill project is underway on the I-70 Mountain Corridor from west of Evergreen to eastern Idaho Springs. Below are traffic impacts for this week: Ramp closures: • 9 a.m. to 3 p.m., Monday-Friday, expect a daytime closure of the eastbound I-70 off-ramp to Hidden Valley/Central City Parkway (Exit 243). • 9 a.m. to 3 p.m., Monday-Friday, expect daytime closures of the westbound I-70 off-ramp to US 6 (Exit 244). Next week: • The week of Nov. 22, motorists can expect an overnight closure from 9 p.m. to 5 a.m. of westbound I-70 at US 6 (Exit 244) for segmental bridge construction on Sunday, Nov. 22, and Tuesday, Nov. 24. All work us subject to change. For weekly project updates, check here or text "floydhill" to 21000 to receive text messages. For overall project information, codot.gov/projects/i70floydhill
Clear
via Loveland Pass
Sensor 0.3 mile West of Herman Gulch Road, 6 min ago
Clear
via I-70
Sensor 0.6 miles E of CO 91 Copper Mountain, 6 min ago
Clear
via Berthoud Pass
Sensor at Fraser Flats CR-83, 6 min ago
Westbound, Wheat Ridge first
Canyon route via Golden
Wheat Ridge to Floyd Hill MP 265–244
Mostly clear. Wind gusts of up to 21 mph are expected.
Between Exit 248: Beaver Brook/Floyd Hill and Exit 243: Hidden Valley (near Floyd Hill) from Mile Point 244.5 to Mile Point 244. Road construction. Starting November 18, 2026 at 9:00AM MST until November 18, 2026 at about 3:00PM MST.
Golden to I-70 at Floyd Hill MP 271.7–257
Mostly clear. Wind gusts of up to 29 mph are expected.
Clear Creek Canyon junction
Floyd Hill to Empire MP 244–232
Slight chance of Light Snow Showers. Wind gusts of up to 38 mph are expected.
US 6 and US 40 run on I-70 from Floyd Hill to Empire.
US 40 to Berthoud Pass
Empire to Loveland MP 232–216
Chance of Light Snow Showers. Expect up to a trace of new snow accumulation. Wind gusts of up to 42 mph are expected.
Empire to Winter Park MP 258.3–231.5 Berthoud Pass 11,307 ft
Chance of Light Snow Showers. Expect up to a trace of new snow accumulation. Wind gusts of up to 40 mph are expected.
Arrive Winter Park
US 6 to Loveland Pass
Loveland to Silverthorne MP 216–205 Eisenhower Tunnel 11,158 ft
Chance of Light Snow Showers. Expect up to a trace of new snow accumulation. Wind gusts of up to 42 mph are expected.
Loveland to A-Basin MP 229.9–221.5 Loveland Pass 11,990 ft
Chance of Light Snow Showers. Expect up to a trace of new snow accumulation. Wind gusts of up to 35 mph are expected.
Arrive A-Basin
US 6 to Keystone
Silverthorne to Copper Mountain MP 205–194.3
Chance of Light Snow Showers. Expect up to 0.5 inches of new snow accumulation. Wind gusts of up to 28 mph are expected.
Silverthorne to A-Basin MP 208.6–221.5
Chance of Light Snow Showers. Expect up to a trace of new snow accumulation. Wind gusts of up to 35 mph are expected.
Arrive A-Basin
Wheat Ridge to Floyd Hill MP 265–244
Mostly clear. Wind gusts of up to 21 mph are expected.
Between Exit 248: Beaver Brook/Floyd Hill and Exit 243: Hidden Valley (near Floyd Hill) from Mile Point 244.5 to Mile Point 244. Road construction. Starting November 18, 2026 at 9:00AM MST until November 18, 2026 at about 3:00PM MST.
Golden to I-70 at Floyd Hill MP 271.7–257
Mostly clear. Wind gusts of up to 29 mph are expected.
Floyd Hill to Empire MP 244–232
Slight chance of Light Snow Showers. Wind gusts of up to 38 mph are expected.
Empire to Winter Park MP 258.3–231.5 Berthoud Pass 11,307 ft
Chance of Light Snow Showers. Expect up to a trace of new snow accumulation. Wind gusts of up to 40 mph are expected.
Arrive Winter Park
Empire to Loveland MP 232–216
Chance of Light Snow Showers. Expect up to a trace of new snow accumulation. Wind gusts of up to 42 mph are expected.
Loveland to A-Basin MP 229.9–221.5 Loveland Pass 11,990 ft
Chance of Light Snow Showers. Expect up to a trace of new snow accumulation. Wind gusts of up to 35 mph are expected.
Arrive A-Basin
Loveland to Silverthorne MP 216–205 Eisenhower Tunnel 11,158 ft
Chance of Light Snow Showers. Expect up to a trace of new snow accumulation. Wind gusts of up to 42 mph are expected.
Silverthorne to A-Basin MP 208.6–221.5
Chance of Light Snow Showers. Expect up to a trace of new snow accumulation. Wind gusts of up to 35 mph are expected.
Arrive A-Basin
Silverthorne to Copper Mountain MP 205–194.3
Chance of Light Snow Showers. Expect up to 0.5 inches of new snow accumulation. Wind gusts of up to 28 mph are expected.
Incidents, road conditions and weather sensors from the CDOT COtrip API. Cameras and overhead signs from the COtrip map feed. Temperatures are road-sensor readings, not forecasts. Not affiliated with CDOT.